Planning → verified scope → supplier evidence → comparison → accepted cost basis
Different evidence states stay visibly separate. Planning estimates are not verified quantities. Supplier quotes are not accepted costs. A low quote is not automatically selected, and selection is not acceptance.
Useful for budgeting and scope discussions only. Never silently promoted into procurement.
Document-supported quantities with source, page/detail, verifier and audit history.
OPEN VERIFICATION GATEOriginal supplier scope, unit pricing, freight, tax, lead time, validity and terms.
OPEN QUOTE INTAKECompare approved quote evidence on the same scope, quantity and currency basis. Scope gaps remain visible instead of being averaged away.
Only genuine verified quantity provenance plus genuine supplier quote evidence can reach this state. Test/synthetic evidence remains locked.
OPEN ACCEPTED COST BASIS REGISTERThis dashboard is ready to hold independent sources side-by-side without overwriting them: supplier system proposals/modulations, contractor estimates, engineer takeoffs, and material quotations.
When real documents arrive, differences in scope or quantity should be surfaced for human reconciliation—not silently blended into one number.
OPEN SCOPE COMPARISON ENGINE