Compare what each proposal includes, excludes, leaves ambiguous, and prices.
Price is never compared without scope. A lower proposal is not treated as cheaper when it omits work, materials, freight, tax, engineering, finishes, or other required scope. Unknown scope stays unknown until a person reconciles it.
Supplier modulation, contractor estimate, engineer takeoff, and material quotes remain separate evidence records.
Each comparable scope item is marked Included, Excluded, Allowance, Owner supplied, or Unclear. Missing information is never assumed.
Where a proposal omits a required item, CostCerta preserves the gap for later pricing instead of pretending the proposals are equivalent.
Only after scope, quantity, currency, IVA/tax, freight and other charges are reconciled should adjusted delivered totals be compared.
This matrix will populate from genuine reviewed documents. It is intentionally empty today.
| Scope category | Proposal A | Proposal B | Proposal C |
|---|---|---|---|
| Structural system | Awaiting document | Awaiting document | Awaiting document |
| Concrete / foundations | — | — | — |
| Reinforcement steel | — | — | — |
| Masonry / wall system | — | — | — |
| Transport / delivery | — | — | — |
| Labor / installation | — | — | — |
| Engineering / professional scope | — | — | — |
| IVA / taxes | — | — | — |
| Exclusions / unresolved gaps | — | — | — |
Original quoted total, identified scope gaps, gap adjustments, and normalized total should remain visible side-by-side so the adjustment never overwrites the supplier's original proposal.
OPEN RECONCILIATION WORKSPACEWhen the first genuine proposal arrives, begin at Document Intake. After review, its supported scope can be routed here without retyping unsupported assumptions.